![](https://ntrix.co.uk/wp-content/uploads/2024/07/dover-lighthouse-refurbishment-works-1-1024x1024.png)
Working with the principal contractor Walker Construction our expert team provided access scaffolding for a phase 1 of works on a listed building in Dover. This work included roof installation and outside works.
The scaffolding is fully self-supporting scaffolding as no ties are allowed on the listed building.
Phase 2 begins in September 2020 and N.T.Rix have already been awarded the package.